Colorado Joint Line
The Joint Line from Denver to Pueblo via Colorado Springs over the Palmer Divide. Two lines were built by the DRGW and ATSF but is today operated as a double track line apart from the sections which have been singled.
 BNSF SD70MAC 8810 is seen leading a southbound loaded coal up the Parlmer Divide in the last light of the day - 19/09/2011 |  BNSF ES44AC 6280 is seen leading a southbound coal train at Larkspur, Colrado - 19/09/2011 |  BNSF SD70MAC 9879 is seen leading a southbound loaded coal up the Parlmer Divide - 19/09/2011 |  BNSF Dash 9 1078 is seen leading a northbound train over the Palmer Dvide and Palmer Lake, Colorado - 19/09/2011 |
 BNSF SD70MAC 9777 is seen working a southbound grain near Palmer Lake, Colorado - 19/09/2011 |  BNSF Dash 9 5180 is seen leading a southbound loaded grain train at Palmer Lake, Colorado - 19/09/2011 |
All Photos © Copyright Jonathan Lewis and may not be re-used without permission. Please e-mail jonathan@milepost39.co.uk if you require a high resolution image.